Is Part Of
EMPTY LABEL
Title
Construction of Highway III
Description
Composition in gray tones (predominant), blue, black, ochre, earthy and white. Smooth texture. It depicts the end of the construction of the Via Dutra in the stretch of the Serra das Araras, as if being viewed through a lens approach, seeing-three workers and some tools. The predominance of gray tones and contrast of light and dark volumes give the composition photographic characteristic paint. On the left, we see half-bust of black workers from the front, slightly facing right, wearing straw hat and shirt without open collar at the center and holding with his on the left hand the handle of a tool that can not be identified to be part hidden by his head. On the right road bed is seen in perspective for background with curve to the right at the end and black belt dividing the lanes. The road is already finished off by-wire saw in the corner of the composition, a set of tools: Paddle parts, a hoe a pestle and a pick. To the left of center of the composition, at lower and the flat bottom, two workers face to face with the trunks angled downwards suggesting they are collecting something on the ground, near a rock and another roadbed in perspective curve to the right. Sees intense blue band to "degrade" darkening at the top.
Location Created
Author
Candido PortinariPerson
Themes
Related Event2
Related Document29
Artwork Function
Executed toArtworkFunctionType
Artwork Function Description
Work executed to decorate main lobby of the Monumento Rodoviário on Presidente Dutra Highway, Piraí, RJ.
Art Form
PanelArtFormType
Art Medium
oilArtMediumType
Artwork Surface
canvasArtworkSurfaceType
Technique
Support spliced vertically.
Collection
Previous Collection
Height
96
Width
768
Annotation
Signed and dated in bottom right corner "C.PORTINARI 936"
Notes
Signature added by Rubem Cassa, at the artist’s request, after the panel’s installation in the Monumento Rodoviário.